Monday, September 30, 2019

September 2019 summary

ELP-CT, L6:

9/28 (Sa): 8.38 KM, 40 mins
9/25 (W): 9.30 KM, 40 mins
9/19 (Th): 6.64 KM, 30 mins
9/16 (M): 6.71 KM, 30 mins
9/12 (Th): 12.25 KM, 45 mins
9/10 (T): 8.92 KM, 40 mins
9/5 (Th): 6.55 KM, 30 mins
9/3 (T): 9.40 KM, 41 mins

★ Total: 68.15 km

No comments: